Dome restaurant 12 meters
This domed restaurant was built in a cold draft assembly on the roof of a 7-storey hotel on the Black Sea coast.
The Green World Company has carried out the following works:
- The base for fixing the dome has been prepared
- The frame of the Dobrosphere Z12 is installed
- The frame is reinforced with bevels due to the presence of a large number of unshielded OSB sections.
- Partially sewn with OSB panels and high-strength polycarbonate.
- The carpet has been laid
- A metal support post has been produced and installed.
- The floor logs of the second floor are installed
- Flexible roof tiles are laid
- A drainage skirt is made
Construction period: 1.5 months
The cost of work on the dome restaurant in the rough cold assembly was RUB.
The materials were bought by the customer.