Domed house. Self-assembly
Our clients independently assembled the D12H frame, sheathed it with OSB slabs and significantly saved on the construction team!
Because, our framework:
- It has a small length of parts, no special equipment is needed, you can cope with a neighbor together
- The assembly is simple - all parts are numbered and follow the assembly instructions
- The time spent on the assembly of the frame is 1-2 days
The house is designed for 207 sq.m. (with full overlap of the second floor)
The frame is made of chamber-dried pine with a cross section of 195 mm, which allows it to be insulated for year-round living.And it is treated with fire protection, which will keep it from the negative effects of moisture and fire.
Sheathed with OSB plates of 15 mm.
The season is already in full swing, the production period is 30 days.
Have time to build up this season!