Ready-made modular house "Portugal" 50 sq.m. - PT3.2

**Not a public offer! The website presents artistic visualization of products, which may differ from the manufacturer’s design documentation. Product prices are indicated as of January 1, 2024 and may vary depending on the product configuration. Check with the seller for current prices.
  • Brand: Green World
  • Product Code: PT50-3.2
  • Availability: In Stock
$27,000

Get a consultation

You can also write to the online chat at the bottom right

This house is ideal for outdoor recreation or country living. Has two bedrooms, living room and kitchen. The roof can be equipped with solar panels, which helps save energy and ensures autonomy.

Manufactured in production. Supplied ready-made.

Consists of 3 modules:

  • House area: 50.4 m2
  • Area of 2 terraces: 20 m2
  • Width of 1 module : 2.8 m
  • Length of 1 module: 6 m
  • Wall thickness: 100/145
  • House size: 8.4 x 9 m

Leave a request to get details from the sales department.

Write a review

Note: HTML is not translated!
    Bad           Good
Captcha

You viewed


PREFAB TECHNOLOGY

90% of the work on making a house takes place in production, excluding lengthy work on site.
After installation on site and connection of communications, all you have to do is bring the furniture into the fully finished house and enjoy life in the new place

SUPPLIED - with external and internal finishing, electrical appliances, sockets, plumbing, toilet, shower, boiler, panoramic windows, all utilities

INCLUDED IN THE PRICE - installation of the house on the site and connecting the house to communications (electricity, sewerage, water supply)

ALL INCLUSIVE

The modular house is completely ready for living, contains interior and exterior decoration, communications

MOBILITY

You can add an additional module, you can transport it to a new location

QUICK ASSEMBLY

Fine assembly on site in 4 days. Free from dirt and construction debris

YEAR ROUND

The house is reliably insulated and easily withstands winter in our latitudes

QUALITY

Modules are manufactured in the factory, subject to quality control at all stages

MANUFACTURING

The assembly time for a modular house in production is from 30 days


TECHNOLOGY AND ENVIRONMENTAL FRIENDLY

We place our main emphasis on the quality and manufacturability of the production of reliable frames, energy efficiency and house design



SELECTED DRY PLANED CONIFEROUS WOOD

BEST QUALITY FINISHING MATERIALS OF PREMIUM BRANDS

MATERIALS THAT CREATE AN ENVIRONMENTALLY COMFORTABLE SPACE

MODERN EQUIPMENT THAT ALLOWS YOU TO ACHIEVE FURNITURE PRECISION

FRAME

  • Dry planed board 45*195/145mm (AB grade, humidity 14-16%)
  • Reinforced fastening system
  • Fire-bioprotection treatment

EXTERIOR FINISH

  • Facade finishing (depending on the model): Fiber cement board / Corrugated board / Imitation timber / Shingles
  • Insulation: Knauf mineral wool 150mm
  • Wind, moisture and vapor barrier films
  • Finishing with corners around the perimeter of the house, slopes in the color of the facade

ROOF

  • Roof covering (depending on the model): click seam, flexible tiles, larch shingles
  • Insulation: Knauf mineral wool 150mm
  • Wind, moisture and vapor barrier films
  • Skate, end strips
  • Hemming the overhangs

INTERIOR FINISH

  • Walls and ceiling - imitation timber, painting
  • Finished floor - tongue and groove floor board, oil treated / quartz-vinyl, baseboards
  • Overlap

FLOOR CONSTRUCTION

  • Joists, planed dry board 195x45mm
  • Wind, moisture and vapor barrier films
  • Insulation: Knauf mineral wool 150mm
  • Floor hemming - board 100x25mm
  • Rodent mesh

WINDOWS AND DOORS

  • Energy efficient double-glazed windows Veka / Rehau, roof windows Werso
  • Window sills
  • Interior doors with fittings and trim
  • Energy efficient entrance doors with fittings and trim

COMMUNICATIONS

  • Hidden electrics: lamps, switches, sockets, automatic machine, electrical panel
  • Ventilation valves with mesh and insulated pipe
  • Mounts for air conditioner
  • Installation of internal water pipes
  • Installation of internal sewerage